Pace stick


This month events in the apartment are locked. The rhythm of it goes like this: 1) the microcement men in the bathroom, I spy a bit on their work and then do the microcementing of the kitchen wall myself, 2) the bathroom floor tiles arrive, 3) the wooden floors are sanded and waxed/oiled white, 4) the kitchen furniture is delivered, 4) the kitchen is installed, 5) the wardrobe carpet arrives.

These can be found in so already from the calendar, in addition to these, the apartment will be occupied at unspecified intervals at least with the painting of the walls, the installation of new doors and the delivery and installation of bathroom furniture and the purchase of wooden open shelves for the kitchen, and to top it all off, the purchase of all the furniture. Massively, that would be a month's worth of chores.

And the team of authors I'm just doing the kitchen section: testing what a self-made microcement wall looks like in the kitchen and getting the wood materials for the open shelves. Luckily, my renovation-minded dad is helping out with this. Or, I guess, conversely, I'm helping him. Or maybe I'll surprise him and harness all my renovation building genes and handle the defiant jobs het nicely. All in all, this interior design side is the most inspiring saga I can imagine alongside the photography side.

IMG_3475
A black marble tile will soon adorn the kitchen floor.
IMG_3476
I also went to measure the bathroom doorway, just as a precaution, to see if the future tub would fit in!
IMG_3479
Not like this, too much run-off. This one was beaten by my wolf. So more white boks are on the way.

Leave a Reply

en_GBEnglish (UK)